Activate Project Performance Dashboard

Enter your company name, the licensed user, and the licence key provided at purchase. Each key is issued to a named user at a company for the licence period.

Project Performance Dashboard

Upload the three P6 .XER files and the reporting calendar file to begin
Step 1

Upload P6 Files

The current .XER is required. The last update and baseline exports add the comparison columns, the change analysis and the baseline curves.
Current .XER
P6 export for this reporting period — drives all progress, float and deliverable data
Last Update .XER
P6 export for the previous update — used for last update finish dates and change analysis
Baseline .XER
Latest working baseline — provides baseline early and late finish dates
Step 2

Specify the Reporting Cadence

The reporting periods every S-curve, histogram and variance column is measured against. Upload the client's own period calendar, or generate one from their review cycle.
Calendar File
Excel file containing the "Calendar (Master)" sheet (reporting periods)
Step 3

Schedule Field Mapping

The three fields below drive the reporting outputs. Pick the user-defined field or activity code that holds each one in your .XER — the tool defaults to user_text7 / user_text8 / user_text9 where they exist.

Activity Coding

Which user-defined field or activity code in the .XER holds each of the three codes that drive the reporting outputs.
Groups every S-curve, histogram, BEI and earned value output.
Identifies key milestones and internal / external interfaces.
Drives the workflow histograms (previously IDC, CRE, CEM, NRR, AFC).

Milestone Code Values

Which values in the milestone field mean each milestone category. Read from the loaded .XER.

Reporting Options

These decide which groups of report sections are available in Step 4.
Step 4

Select the Report Sections

Tick the sections to include in this reporting pack. Everything is regenerated from the files loaded in Step 1, on the cadence set in Step 2, using the mapping set in Step 3.

Section 1 — Executive Summary

A single 16:9 panel that exports to one PowerPoint slide.

Section 2 — Narratives

Auto-generated from the uploaded .XER files, and editable on the report itself.

Section 3 — KPI Cards

Each card is selected individually and they share one row at the top of the report.

Section 4 — Activity S-Curves

Cumulative activity completions against the reporting calendar.

Section 5 — Schedule Analysis

The detailed schedule sections.
Workflow code values to include
One histogram per work package — tick the ones to include

Section 6 — Earned Value Management

Read from the cost-loaded resource assignments in the current .XER.

Section 7 — Schedule Quality

Structural health checks against the current .XER.

Section 8 — Resource Analysis

Built by spreading the resource assignments in each .XER across the reporting calendar. Labour resources only by default — the resource type and the units / cost basis are switchable on the report.

Project S-Curve — Planned vs Actual vs Forecast

Cumulative activity completions by reporting period. Planned Baseline Early Finish = Baseline Finish · Planned Late Finish = Baseline Late Finish · Actual = Actual Finish · Current Forecast = Current Finish. Red vertical line = time now (last period with actuals).

Project Task Completion Histogram

Grey = planned (Baseline Finish) across the full project · Dark = actual completions to date · Blue = remaining forecast (Current Finish of incomplete activities).

Key Milestone Status

Variances in calendar days: negative (red) = current finish is in delay of the comparison date, positive (green) = current finish is earlier than the comparison date. "A" = actual, "*" = constrained date.
Activity IDMilestoneStatus Baseline FinishLast Update FinishCurrent Finish Var vs Last Update (d)Var vs Baseline (d)Total Float (d)

Baseline Execution by Work Package

BEI = Total Number of Tasks Complete to Date Divided by the Number of Tasks That Should be Complete in the Performance Measurement Baseline (PMB). Sorted highest BEI first. % complete = tasks complete ÷ total tasks in the data file for each work package.

External Interface Milestones

Activity IDInterfaceStatus Baseline FinishLast Update FinishCurrent Finish Var vs Last Update (d)Var vs Baseline (d)Total Float (d)

Internal Interface Milestones

Activity IDInterfaceStatus Baseline FinishLast Update FinishCurrent Finish Var vs Last Update (d)Var vs Baseline (d)Total Float (d)

Schedule Change Analysis

Current .XER compared against the last update .XER. Not filtered by the project selector — the comparison covers the whole schedule.
TypeActivity IDActivity / RelationshipDetail

Publish as a Web Page

Writes a single self-contained .html file holding the sections in this report, with live charts you can hover and read. No .XER, no licence key and no internet connection are needed to open it — email it, or drop it on SharePoint or Teams.